The operating system for decentralized computing
Hinterland Hack 2026 · Challenge aurivolt
THE NEED
And computing power needs data centers.
≈ 7 GW
2020
≈ 12 GW
2025
≈ 35 GW
2030
Power for data centers in Europe (IT load, approx.). 2030: McKinsey (Oct 2024, via Reuters) · 2025: ENTSO-E (12.7 GW) · 2020: back-calculated with ~12% annual growth (IEA)
THE PROBLEM
Sources: Rheinenergie via Clean Energy Wire (grid connection 10–15 years) · ingenieur.de / VDI (Oct 8, 2026) · hessenschau.de (July 8, 2026), ≈ €3 bn via DatacenterDynamics
AURIVOLT’S ANSWER
THE CATCH
The Brain
UNDER THE HOOD
The Brain
UNDER THE HOOD
The Brain
Container A
CPU 97 %
Container A
CPU 72 %
Container B
CPU 41 %
Container B
CPU 66 %
CONTAINER A
Brain, I’m overloaded. I need to hand something off.
THE BRAIN
OK. Send db-17 to container B. It has free capacity.
CONTAINER A
Hi B, here comes db-17. Live, no downtime.
DEMO
ONE MORE THING
A container site in Bielefeld. Signed this weekend.
Letter of Intent
Team “The Brain” · Hinterland Hack 2026
Container site
Bielefeld
SIGNED · OCTOBER 2026

TRY IT
Scan me